{"id":15857,"date":"2026-10-15T14:37:58","date_gmt":"2026-10-15T09:07:58","guid":{"rendered":"https:\/\/www.tripbeam.com\/blog\/?p=15857"},"modified":"2026-10-15T14:37:58","modified_gmt":"2026-10-15T09:07:58","slug":"mumbai-airport-terminal-1-closure-2026","status":"publish","type":"post","link":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/","title":{"rendered":"Mumbai Airport Terminal 1 to Close From October 25 as Flights Move Elsewhere"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Mumbai Airport is about to see major changes with the redevelopment of Terminal 1. Mumbai International Airport Limited (MIAL) has announced plans to phase out T1 operations, with redevelopment work scheduled to begin in January 2027.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, the flight transition is still being worked out. The Civil Aviation Ministry has asked airport operator Adani Airports to defer the planned shift of international flights to Navi Mumbai while airlines and the operator discuss the next steps. Passengers should therefore check the latest airline notification before travelling through Mumbai Airport.<\/span><\/p>\n<h2><b>What Is Happening at Mumbai Airport Terminal 1?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">MIAL plans to redevelop the ageing Terminal 1 in phases. The first stage focuses on the North Section of Terminal 1B, rather than shutting down all of Mumbai Airport.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The redevelopment covers about one-third of Terminal 1\u2019s capacity, based on MIAL\u2019s figures. At the airport level, around 91% of passengers are expected to continue using unaffected operations. The redevelopment is planned to increase T1\u2019s capacity from about 15 million to 20 million passengers annually after completion. The airport operator says redevelopment work will begin in January 2027.<\/span><\/p>\n<h2><b>What Happens to Flights Using Terminal 1?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Airlines operating from Mumbai Airport T1 have been considering different options, including moving some services to <\/span><b>Navi Mumbai International Airport (NMIA)<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The situation is still developing. The government has asked for the planned international-flight shift to be deferred after airlines raised operational and commercial concerns. Reports indicate that discussions are continuing over how and when flights should be redistributed. Passengers should not assume that every T1 flight will automatically move to Navi Mumbai. For the latest information about your departure airport and terminal, check your airline\u2019s notification.<\/span><\/p>\n<h3><b>Why Is Mumbai Airport Redeveloping Terminal 1?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Terminal 1 is ageing and has been under redevelopment discussions for several years. MIAL points to safety and the ageing facility as key reasons for redeveloping Terminal 1.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project is also part of Mumbai\u2019s larger airport development plans. Navi Mumbai International Airport now provides another airport within the Mumbai Metropolitan Region, giving airlines an additional operating option during the redevelopment period.<\/span><\/p>\n<h3><b>What Should Passengers Check Before Flying to Mumbai Airport T1?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Don\u2019t rely on an old booking confirmation when flying during the Terminal 1 changes. Check the latest flight details before you leave home.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Open your airline app or check your latest SMS and email updates.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Look at your booking and confirm the airport and terminal.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Check the details again a day or two before your flight.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Flying from Navi Mumbai International Airport? Leave extra time for the journey.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have a connection? Check whether your next flight leaves from the same airport.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Save your airline\u2019s customer service number in case you need to contact them.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Getting to Navi Mumbai Airport is also fairly straightforward. Buses, taxis, autorickshaws, and app-based cabs serve the airport. There is also an hourly free shuttle between Navi Mumbai International Airport and Chhatrapati Shivaji Maharaj International Airport, Mumbai.<\/span><\/p>\n<h4><b>What Does This Mean for USA to India Travelers?<\/b><\/h4>\n<p><span style=\"font-weight: 400;\">Flying from the USA to India through Mumbai? Take a close look at the airport on your ticket. Mumbai has two airports now, so don\u2019t assume your flight will use the same one as before.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A domestic connection adds another thing to check. You could arrive at one airport and depart from the other, which means you\u2019ll need to travel between them before your next flight.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">So, check the arrival airport, departure airport, and connection time when planning your trip. This is important if you <\/span><a href=\"https:\/\/www.tripbeam.com\/flights-to-india\/\"><b>book flights from USA to India<\/b><\/a><span style=\"font-weight: 400;\"> and a domestic India flight separately. For the best international flight deals check <\/span><b>Tripbeam<\/b><span style=\"font-weight: 400;\"> ahead of booking.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai Airport is about to see major changes with the redevelopment of Terminal 1. Mumbai International Airport Limited (MIAL) has announced plans to phase out T1 operations, with redevelopment work scheduled to begin in January 2027. However, the flight transition is still being worked out. The Civil Aviation Ministry has asked airport operator Adani Airports to defer the planned shift of international flights to Navi Mumbai while airlines and the operator discuss the next steps. Passengers should therefore check the latest airline notification before travelling through Mumbai Airport. What Is Happening at Mumbai Airport Terminal 1? MIAL plans to redevelop the ageing Terminal 1 in phases. The first stage focuses on the North Section of Terminal 1B, rather than shutting&#8230;<\/p>\n","protected":false},"author":9,"featured_media":15858,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2294,19,1],"tags":[660],"class_list":["post-15857","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-flights","category-travel","category-travel-news","tag-flights-from-usa-to-india"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mumbai Airport Terminal 1 Will Shut From October 25<\/title>\n<meta name=\"description\" content=\"Mumbai Airport Terminal 1 redevelopment is bringing changes from October 2026. Check the latest flight shifts, Navi Mumbai updates, and passenger advice.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mumbai Airport Terminal 1 Will Shut From October 25\" \/>\n<meta property=\"og:description\" content=\"Mumbai Airport Terminal 1 redevelopment is bringing changes from October 2026. Check the latest flight shifts, Navi Mumbai updates, and passenger advice.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"TripBeam Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/tripbeamofficial\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T09:07:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.tripbeam.com\/blog\/wp-content\/uploads\/2026\/10\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1667\" \/>\n\t<meta property=\"og:image:height\" content=\"872\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@trip_beam\" \/>\n<meta name=\"twitter:site\" content=\"@trip_beam\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/\"},\"author\":{\"name\":\"Admin\",\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/#\\\/schema\\\/person\\\/7b03231f990108d5756c8c71d8cb92c2\"},\"headline\":\"Mumbai Airport Terminal 1 to Close From October 25 as Flights Move Elsewhere\",\"datePublished\":\"2026-10-15T14:37:58+05:30\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/\"},\"wordCount\":610,\"image\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp\",\"keywords\":[\"flights from usa to india\"],\"articleSection\":[\"Flights\",\"Travel\",\"Travel News\"],\"inLanguage\":\"en-US\",\"dateModified\":\"2026-10-15T14:37:58+05:30\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/\",\"url\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/\",\"name\":\"Mumbai Airport Terminal 1 Will Shut From October 25\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp\",\"datePublished\":\"2026-10-15T09:07:58+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/#\\\/schema\\\/person\\\/7b03231f990108d5756c8c71d8cb92c2\"},\"description\":\"Mumbai Airport Terminal 1 redevelopment is bringing changes from October 2026. Check the latest flight shifts, Navi Mumbai updates, and passenger advice.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp\",\"contentUrl\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp\",\"width\":1667,\"height\":872,\"caption\":\"Mumbai Airport Terminal 1 Will Shut From October 25 copy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/mumbai-airport-terminal-1-closure-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Flights\",\"item\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/category\\\/flights\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mumbai Airport Terminal 1 to Close From October 25 as Flights Move Elsewhere\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/\",\"name\":\"TripBeam\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/#\\\/schema\\\/person\\\/7b03231f990108d5756c8c71d8cb92c2\",\"name\":\"Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/abc38516d8089b81f726be5d9c8393e4790d3edae7ad34dc38edf8edb4345656?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/abc38516d8089b81f726be5d9c8393e4790d3edae7ad34dc38edf8edb4345656?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/abc38516d8089b81f726be5d9c8393e4790d3edae7ad34dc38edf8edb4345656?s=96&d=mm&r=g\",\"caption\":\"Admin\"},\"url\":\"https:\\\/\\\/www.tripbeam.com\\\/blog\\\/author\\\/seomanager\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mumbai Airport Terminal 1 Will Shut From October 25","description":"Mumbai Airport Terminal 1 redevelopment is bringing changes from October 2026. Check the latest flight shifts, Navi Mumbai updates, and passenger advice.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/","og_locale":"en_US","og_type":"article","og_title":"Mumbai Airport Terminal 1 Will Shut From October 25","og_description":"Mumbai Airport Terminal 1 redevelopment is bringing changes from October 2026. Check the latest flight shifts, Navi Mumbai updates, and passenger advice.","og_url":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/","og_site_name":"TripBeam Blog","article_publisher":"https:\/\/www.facebook.com\/tripbeamofficial","article_published_time":"2026-10-15T09:07:58+00:00","og_image":[{"width":1667,"height":872,"url":"https:\/\/www.tripbeam.com\/blog\/wp-content\/uploads\/2026\/10\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp","type":"image\/webp"}],"author":"Admin","twitter_card":"summary_large_image","twitter_creator":"@trip_beam","twitter_site":"@trip_beam","twitter_misc":{"Written by":"Admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/#article","isPartOf":{"@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/"},"author":{"name":"Admin","@id":"https:\/\/www.tripbeam.com\/blog\/#\/schema\/person\/7b03231f990108d5756c8c71d8cb92c2"},"headline":"Mumbai Airport Terminal 1 to Close From October 25 as Flights Move Elsewhere","datePublished":"2026-10-15T14:37:58+05:30","mainEntityOfPage":{"@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/"},"wordCount":610,"image":{"@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.tripbeam.com\/blog\/wp-content\/uploads\/2026\/10\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp","keywords":["flights from usa to india"],"articleSection":["Flights","Travel","Travel News"],"inLanguage":"en-US","dateModified":"2026-10-15T14:37:58+05:30"},{"@type":"WebPage","@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/","url":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/","name":"Mumbai Airport Terminal 1 Will Shut From October 25","isPartOf":{"@id":"https:\/\/www.tripbeam.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/#primaryimage"},"image":{"@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.tripbeam.com\/blog\/wp-content\/uploads\/2026\/10\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp","datePublished":"2026-10-15T09:07:58+00:00","author":{"@id":"https:\/\/www.tripbeam.com\/blog\/#\/schema\/person\/7b03231f990108d5756c8c71d8cb92c2"},"description":"Mumbai Airport Terminal 1 redevelopment is bringing changes from October 2026. Check the latest flight shifts, Navi Mumbai updates, and passenger advice.","breadcrumb":{"@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/#primaryimage","url":"https:\/\/www.tripbeam.com\/blog\/wp-content\/uploads\/2026\/10\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp","contentUrl":"https:\/\/www.tripbeam.com\/blog\/wp-content\/uploads\/2026\/10\/Mumbai-Airport-Terminal-1-Will-Shut-From-October-25-copy.webp","width":1667,"height":872,"caption":"Mumbai Airport Terminal 1 Will Shut From October 25 copy"},{"@type":"BreadcrumbList","@id":"https:\/\/www.tripbeam.com\/blog\/mumbai-airport-terminal-1-closure-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.tripbeam.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Flights","item":"https:\/\/www.tripbeam.com\/blog\/category\/flights\/"},{"@type":"ListItem","position":3,"name":"Mumbai Airport Terminal 1 to Close From October 25 as Flights Move Elsewhere"}]},{"@type":"WebSite","@id":"https:\/\/www.tripbeam.com\/blog\/#website","url":"https:\/\/www.tripbeam.com\/blog\/","name":"TripBeam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.tripbeam.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.tripbeam.com\/blog\/#\/schema\/person\/7b03231f990108d5756c8c71d8cb92c2","name":"Admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/abc38516d8089b81f726be5d9c8393e4790d3edae7ad34dc38edf8edb4345656?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/abc38516d8089b81f726be5d9c8393e4790d3edae7ad34dc38edf8edb4345656?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/abc38516d8089b81f726be5d9c8393e4790d3edae7ad34dc38edf8edb4345656?s=96&d=mm&r=g","caption":"Admin"},"url":"https:\/\/www.tripbeam.com\/blog\/author\/seomanager\/"}]}},"_links":{"self":[{"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/posts\/15857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/comments?post=15857"}],"version-history":[{"count":1,"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/posts\/15857\/revisions"}],"predecessor-version":[{"id":15859,"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/posts\/15857\/revisions\/15859"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/media\/15858"}],"wp:attachment":[{"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/media?parent=15857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/categories?post=15857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tripbeam.com\/blog\/wp-json\/wp\/v2\/tags?post=15857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}